Lane Closures on SR 400 at Pilgrim Mill Road Expected Sept. 8-11
SR 400 will have scheduled daytime lane closures and traffic paces at Pilgrim Mill Road for bridge construction Tuesday, Sept. 8 through Friday, Sept. 11.
Below is the schedule of planned traffic impacts:
Tuesday, Sept. 8 (7 a.m. to 3 p.m.)
• Two lane (outside) closure on SR 400 northbound at Pilgrim Mill Road
• Several traffic paces on SR 400 northbound
Wednesday, Sept. 9 (7 a.m. to 3 p.m.)
• One lane (inside) closure on SR 400 northbound at Pilgrim Mill Road
• Several traffic paces on SR 400 northbound
Thursday, Sept. 10 (9 a.m. to 5 p.m.)
• Two lane (inside) closure on SR 400 southbound at Pilgrim Mill Road
• Several traffic paces on SR 400 southbound
Friday, Sept. 11 (9 a.m. to 5 p.m.)
• One lane (outside) closure on SR 400 southbound at Pilgrim Mill Road
• Several traffic paces on SR 400 southbound
The work is weather dependent which could result in some fluctuation. Updates will be posted on the County Facebook and Twitter pages as necessary.